This week, drilling began for the first caissons that will support the underground parking garage. Caissons are a network of underground concrete pilings that support structures—in this case, the Obama Presidential Center campus! Preparatory work also began for the caissons that will support the Museum Building. Drilling for those caissons will begin this Monday, December 13.
Drilling and installation of geothermal energy wells continues on schedule.


Help build the Obama Presidential Center
Your donation makes it possible for us to build a world-class museum, library, and gathering spaces on Chicago’s South Side.
Donate to the Barack Obama Foundation. The Barack Obama Foundation is registered as a 501(c)(3) non-profit organization (EIN 46-4950751).

Follow Along
More construction updates
- The Center
- Building the Center

- The Center
- Building the Center

- Building the Center
- Sustainability

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Barack Obama

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Chicago

- Building the Center
- Barack Obama

- Building the Center
- Chicago

- Building the Center
- Chicago